Tuesday, 15 December 2020 / Published in Uncategorized
AVN2000 finished 720m drive at Palma de Mallorca
After several months drilling, on Dec 4th (St. Barbara’s Day) our AVN1800 outskirted to 2000mm, saw the light at the exit shaft on Av. Gabriel Alomar. It was a 720m length drive under Palma de Mallorca streets.